Railway line

Railways sanctions PET Survey of New Railway lines in Karnataka

The ministry of railways has accorded sanction for conducting survey for the following sections in Karnataka-  Shravanabelagola to Madikeri via Holenarsipiura- Arkalgud-Konanur -Kushalnagar for a length of 117 KM. Gangavathi to Daroji for a length of 36 KM. The railway board has sanctioned the amount to carry out the survey for preliminary engineering & traffic.(PETS) […]

Continue Reading
System Map of Mysuru Mangaluru Railway line via Hassan including Arsikere

Tender: Electrification of Mysuru Mangaluru Railway Line

The Central Organisation for Railway Electrification (CORE) has invited bids for the Electrification of Mysuru Mangaluru Railway Line via Hassan including Arsikere line. The tender work involves “Design, Supply, Erection, Testing and Commissioning of 25kV, 50 Hz, Single Phase, AC Electrification Works including OHE & TSS as Composite Electrical Work” in Mysuru(Excl)- Hassan(Incl)- Mangaluru(Excl)/ Arsikere(Excl) […]

Continue Reading
Railway Line

Proposed Bidar – Srirangapatna Railway line to boost Industrial Activity

To boost industrial development across the state, the Karnataka government in its Industrial Policy 2020-2025 has included a proposal to build a railway corridor (Bidar – Srirangapatna Railway line). There is already an electrified railway track from Srirangapatna to Mysuru. The work on electrification of the track from Mysuru to Chamarajanagar will begin shortly. This […]

Continue Reading

Made in Mysuru: 160kmph fit MEMU Wheel Set

In a first, Mysuru Workshop’s Wheel Shop Manufactures 160 KMPH fit MEMU Motor Coach Wheel Set Earlier, Bharat Earth Movers Limited (BEML) had sought Mysuru Workshop to manufacture the 900 Trailer Coaches Wheel sets for 225 Trailer Coach Cars and 300 Motor Coach Wheel Set for 75 Motor Coach Cars.  BEML is manufacturing MEMU coaches […]

Continue Reading