Indian Railways will be conducting a Survey for electrification of Vyasa Colony – Amravathi Colony (120 RKM / 150 TKM) section of Davangere – Hospete Railway line in the South Western Railways limits.
Conducting a survey for the electrification of a railway line is a critical step in assessing the feasibility, cost, and benefits of such a project. The survey will help gather essential information about the existing infrastructure, potential obstacles, and required resources.
Advertised Value: Rs. 21.19 Lakhs (2119000.00 )
Period of Completion: 3 Months
Scope of work:
The appointed agency is supposed to develop drawings & BOQ related to electrical systems. Which includes Foot by foot survey, preparation of OHE drawings i.e. pegging plan , wiring diagrams , sectioning diagrams, General Power Supply arrangements, including location plans of traction substations & Switching Stations along with Quantity Schedule as per requirement duly considering the Track Layout/Signal Locations.
[…] […]