Mysuru Maikeri Highway

Four Lane Access Controlled Mysuru-Kushalnagar NH275 Repackaged Tender Called

The highway will be 4 laned & access controlled. Total cost of the project is 2966.97 Crore INR excluding GST.  Brief Earlier this year, NHAI had called tenders for Package -II & III for 4 laning of NH 275 sections, the same have been withdrawn and are being Re-tendered.   In this regard, the earlier called […]

Continue Reading
Trumpet Interchange Mysuru-Madikeri Highway

Part Tender for 4 laning of NH 275 between Mysuru to Kushalnagar called

The highway will be 4 laned & access controlled  Brief Earlier this year, NHAI had called tenders for Package -II & Package III for 4 laning of NH 275 sections, the same have been withdrawn and are being Re-tendered.   In this regard, the earlier called Package -II tender between Guddehosur near Kushalnagar to SH – […]

Continue Reading
trumpet interchange: Mysuru Bengaluru Highway

RFP tender invited for the package-III of Mysuru Madikeri Highway

Madikeri aka Coorg, known for its coffee plantations, steep hills, countless streams, rich flora & fauna, lush forests and breathtaking views,  is a beautiful hill station. The city will finally see a world-class highway that will connect the Bangaluru Mysuru expressway at Srirangapatna. This new Mysuru Madikeri highway will change the way people travel to […]

Continue Reading

Road Under Bridges to be constructed along Mysuru Outer Ring Road 

Details of the Road Under Bridges (RUB) to be constructed along National Highway 275K (Mysuru Outer Ring Road) To provide bottleneck free drive along the Outer Ring Road, NHAI-Bengaluru division has initiated civil works tender to widen the existing Road Under Bridges (RUB). Total cost of the project amounts to 85.13 crore INR.  Following existing […]

Continue Reading
Three-Tier Grade Separator Representational Pic

Three Tier Traffic Interchange at Columbia Asia Junction

NHAI engineers have finally zeroed in onto a three-tier grade separator/Interchange at the junction of Mysuru-Bengaluru NH-275 and ORR NH-275K. This comes after initially proposing a cloverleaf separator which proved to be cost-prohibitive considering the land acquisition involved which had to be replaced with a more compact, as efficient and economical design in the form […]

Continue Reading