The Southern Railway has called tender to conduct the final location survey for the new semi high speed rail line between Chennai Central and Bengaluru (Byappanahalli) stations.
The proposed New Semi High Speed Rail line will be designed for a speed of 220 kmph with a operational speed of 200 kmph between Chennai Central and Bengaluru (Byappanahalli station) using Aerial LIDAR survey and developing detailed final alignment, conducting traffic study, preparation of detailed plans and estimate and submission of DPR etc. The approximate length of the railway line is expected to be around 350 Klm.
Final Location Survey (FLS)
A final location survey is the first important step that is carried out during detailing of any railway project. It is in this survey where multidisciplinary investigations like topographical, geotechnical, hydrological etc. are taken up and the consolidated data is used to finalise route alignment and identify land usages.
Tender Brief
Final Location Survey for New Semi High Speed Rail line between Chennai Central and Bengaluru (Byappanahalli) stations (350 KM)
Advertised Value: Rs. 83643390.64
Period of Completion: 3 Months
Benefits of the new railway Line
The Chennai-Bengaluru (Byappanahalli) new semi high speed rail line is a proposed project aimed at improving connectivity between the two major cities in South India. Here are some of the potential benefits of this railway line:
Reduced travel time: The semi-high-speed rail line will significantly reduce the travel time between Chennai and Bengaluru. It is expected to operate at speeds of around 160-200 kmph, which is faster than conventional trains. This would greatly benefit passengers who frequently travel between the two cities, allowing them to reach their destinations more quickly.
Improved efficiency and reliability: The new railway line will be designed to handle higher speeds, resulting in improved efficiency and reliability of train services. With fewer stops and faster travel times, it would offer a more time-effective transportation option compared to road travel or conventional trains.
Increased capacity: The semi-high-speed rail line will have the potential to accommodate more passengers and freight, thereby addressing the growing demand for transportation between Chennai and Bengaluru. This increased capacity can help ease congestion on existing modes of transportation and contribute to the economic development of both cities.
Economic growth and development: Improved connectivity between Chennai and Bengaluru can further stimulate economic growth and development in the region. It can facilitate the movement of people, goods, and services, fostering trade, tourism, and business activities. The railway line can attract investment, create job opportunities, and boost local economies along its route.
Environmental benefits: Compared to other modes of transportation like road or air, railways are generally more environmentally friendly. The new semi-high-speed rail line would provide a greener transportation alternative, potentially reducing carbon emissions, traffic congestion, and dependence on fossil fuels.
Improved intercity mobility: The semi-high-speed rail line can enhance intercity mobility by providing a convenient and comfortable mode of transportation for commuters, professionals, and students who frequently travel between Chennai and Bengaluru. This can lead to increased mobility, improved work-life balance, and enhanced access to education and employment opportunities.
It’s important to note that these benefits are based on the proposed plans for the Chennai-Bengaluru (Byappanahalli) semi-high-speed rail line and are subject to implementation, operational efficiency, and other factors that may arise during the construction and operation phases of the project.
[…] the Southern Railway had issued a tender to conduct the final location survey for the new semi-high-speed rail line between Chennai Central and Bengaluru (Byappanahalli) […]