- Advertisement -
National High Speed Rail Corporation Limited (NHSRCL) has called tender for carrying out Environmental Impact Assessment Study / Field Work and Preparation of Environment Impact Assessment Report and Environment Management Plan for Chennai – Mysuru High Speed Rail Corridor (About 45 klm long)
Activities to be Performed for Carrying out EIA Study
- Identification of Study Area
- Preparation of Inception Report and Feasibility/Screening Report
- Preparation of Environment Management Framework
- Preparation of Strip Map of the Alignment
- Environmental Impact Assessment Study
Also Read:- Tender: Final Alignment Design including Aerial Lidar Survey for Chennai – Mysuru High Speed Rail Corridor
- Advertisement -